


Techtron® HPV
A Boedeker Plastics, Inc. Case Study
This case study shows how Boedeker Plastics, Inc. partnered with maintenance staff at a bean processing facility to significantly extend the wear life of a critical conveyor bearing. By selecting the right plastic solution and refining the application, the team reduced changeouts and unplanned stops, cutting maintenance cost and downtime. The result is a more reliable line, higher throughput, and greater confidence in day to day operations.
Download a free copy of our case history and learn more about how we helped a Bean Processor reduce operating costs. By significantly increasing uptime by increasing part life by 12X of a critical conveyor flange seal bearing with Techtron® HPV.